The electrical harness and plumbing systems are installed in the main hull and the openings for hatches and the companionway have been cut.
The electrical harness and plumbing systems are installed in the main hull and the openings for hatches and the companionway have been cut.
The GF42 is featured on Scuttlebutt Sailing News. Video footage by Roger Floyd is from Day 1 of Ulmann Sails 2015 Long Beach Race Week.
http://www.sailingscuttlebutt.com/2015/06/28/video-this-girlfriend-is-wet-and-wild/
Unfortunately the mast was damaged shortly after being stepped so the boat had to be towed +45 miles up the coast of California to its slip while the mast is being repaired. During the 14-18kt delivery with both PORT & STBD foils lowered 50% it began lifting out of the water at 10 knots as designed.