GREG LYNN FORM

specifications

GENERAL SPECIFICATIONS:
100% CARBON/ EPOXY VACUUM CONSOLIDATED ON CNC TOOLING
LENGTH: 42 FT OVERALL
BEAM: 32 FT OVERALL
DRAFT: 7.38 FT – 1.85 FT
MEASUREMENT WEIGHT: 5800 LBS
RIG: 63.68 FT CARBON ROTATING WING MAST W/ SINGLE SPREADERS
CARBON STANDING RIGGING
SAIL AREA: 1211 FT2 UPWIND & 2061 FT2 DOWNWIND
MAINSAIL, TRINQUETTE, SOLENT, CODE ZERO & GENNAKER
ANTAL® WINCH & HARDWARE PACKAGE
TUFCOTE™ TEFLON ANODIZED GOIOT HATCHES
ELECTRIC ENGINE
INTERIOR SPECIFICATIONS:
ALL INTERIORS EPOXY VACUUM CONSOLIDATED ON CNC TOOLING
3 BERTHS W/ RECESSED CORK SURFACE
PRESSURIZED COLD WATER & ELECTRIC REFRIGERATOR
GALLEY W/ SINGLE SINK & SINGLE BURNER INDUCTION COOKTOP
ENCLOSED HEAD W/ ELECTRIC TOILET & SHOWER
10 SHELVES
FURNITURE PAINTED IN HOUSE OF KOLOR SHIMRIN®
INTERIOR IN CLEAR COATED CARBON
PAINTED & CORK CARBON FLOORBOARDS
50 GAL. FRESH WATER TANK
800 FT2 COCKPIT

NEWS

GF42 on Scuttlebutt

scuttlebutt

The GF42 is featured on Scuttlebutt Sailing News. Video footage by Roger Floyd is from Day 1 of Ulmann Sails 2015 Long Beach Race Week.

http://www.sailingscuttlebutt.com/2015/06/28/video-this-girlfriend-is-wet-and-wild/

AZURE MAGAZINE

azure_gf42web
The GF42 was number “16 THE THRILL OF SPEED” in the article “20 WAYS TRAVEL IS CHANGING” in the MAR/APR 2015 issue of Azure Magazine on page 75.

MAR/APR 2015 issue of AZURE Magazine

AERIAL

eric_heli_news
Thanks to Eric Leishman for the photos of the boat from a helicopter.
Waiting for the mast to be stepped on March 27th.

DOCKED

mdr
The boat is now in Marina Del Rey, CA at its slip waiting for the mast so we can start sailing.

DELIVERED

delivery
Unfortunately the mast was damaged shortly after being stepped so the boat had to be towed +45 miles up the coast of California to its slip while the mast is being repaired. During the 14-18kt delivery with both PORT & STBD foils lowered 50% it began lifting out of the water at 10 knots as designed.
VIDEO LINK

LAUNCHED

floating
Riding on its lines at less than 5800 lbs. total.

LIFTED

launched
It was lifted by crane, foils and rudders were installed from below, it was swung out over the water and launched.

ROADTRIP

street
The boat launched during the holidays in Southern California from the
yard at Westerly Marine in Santa Ana to Newport Beach.

RIGGING

rigging (2)
Marlow running rigging package being installed

HARDWARE

IMG_20141109_154809
Winches and deck hardware installed